Return to Main Site
Completed rough framing on elevator shaft. Date: 02/03/2009
Rob Lowe and Steve Belomt working on the layout. Date: 02/05/2009
Dan Tsvirinko pulling electrical feeds for the elevator. Date: 02/05/2009
Dan Tsvirinko. Date: 02/05/2009
Rob Lowe and John Foster snapping lines for the walls. Date: 02/03/2009
Steve Belmont cutting main supports for the elevator Date: 02/03/2009
Steve and Harold Belmont working on the framing. Date: 02/03/2009
Rob Lowe checking dimensions. Date: 02/03/2009
Steve and Harold showing their handy-work. Date: 02/03/2009
Return to Gallery   Pause   Back One Image   delay:   direction:   max size: