Completed rough framing on elevator shaft.
Date: 02/03/2009
Rob Lowe and Steve Belomt working on the layout.
Date: 02/05/2009
Dan Tsvirinko pulling electrical feeds for the elevator.
Date: 02/05/2009
Dan Tsvirinko.
Date: 02/05/2009
Rob Lowe and John Foster snapping lines for the walls.
Date: 02/03/2009
Steve Belmont cutting main supports for the elevator
Date: 02/03/2009
Steve and Harold Belmont working on the framing.
Date: 02/03/2009
Rob Lowe checking dimensions.
Date: 02/03/2009
Steve and Harold showing their handy-work.
Date: 02/03/2009