|
Completed rough framing on elevator shaft.
|
Rob Lowe and Steve Belomt working on the layout.
|
Dan Tsvirinko pulling electrical feeds for the elevator.
|
Dan Tsvirinko.
|
|
Rob Lowe and John Foster snapping lines for the walls.
|
Steve Belmont cutting main supports for the elevator
|
Steve and Harold Belmont working on the framing.
|
Rob Lowe checking dimensions.
|