Return to Main Site
Login
CBC Photo Gallery Take Another Step February 2, 2009
View Slideshow

February 2, 2009

Completed rough framing on elevator shaft.
 
 

Completed rough framing on elevator shaft.

Rob Lowe and Steve Belomt working on the layout.
 
 

Rob Lowe and Steve Belomt working on the layout.

Dan Tsvirinko pulling electrical feeds for the elevator.
 
 

Dan Tsvirinko pulling electrical feeds for the elevator.

Dan Tsvirinko.
 
 

Dan Tsvirinko.

Rob Lowe and John Foster snapping lines for the walls.
 
 

Rob Lowe and John Foster snapping lines for the walls.

Steve Belmont cutting main supports for the elevator
 
 

Steve Belmont cutting main supports for the elevator

Steve and Harold Belmont working on the framing.
 
 

Steve and Harold Belmont working on the framing.

Rob Lowe checking dimensions.
 
 

Rob Lowe checking dimensions.

Steve and Harold showing their handy-work.
 
 

Steve and Harold showing their handy-work.

     
Page: 1
©Copyright 2006 Campus Bible Church. All rights reserved.